Epsco Case Studies


During the last 1000 days EPSCO has spent over 9000 man days on clients sites without incident.  EPSCO has never had a L.T.A. since the business started in 1991.  We put that down to the quality of the people we employ and the initial and ongoing training programmes we have in place.  Safety is part of our culture (we do not just talk it – we do it).

A fairly typical year for EPSCO technical teams would be a combination of the following:

INDUSTRYMAN DAYSPROJECT DETAILS
WHISKY DISTILLING288Cooling systems including cooling towers, condensers, pipework, heat exchangers, heating tanks, spring collection systems, filters, main storage and fire water tanks, distribution systems, pre heaters and effects.
MALTINGS24Steep tanks, water storage and distribution systems.
MARINE285Cargo loading and discharge lines, holding tanks and distribution systems, heat exchangers and cooling systems.
BREWING173Cooling systems including evaporative condensers, bright beer tanks, main storage tanks and distribution systems.
OFFSHORE (Drilling and Production)178Loading, storage and distribution systems. Reverse osmosis and ultra filtration plants. Calorifiers and heat exchangers.
POWER GENERATION (Oil, Gas, Coal)386Air cooled condensers, air blast condensers, main water cooling systems including cooling tower fill pack and condensers. Gas compressor inter and after coolers. Reverse osmosis and filtration plants.
WATER INDUSTRY738Water treatment works including filtration and reverse osmosis systems. Trunk mains and distribution systems. Raw water and clear water reservoirs.
GENERAL INDUSTRY (Manufacturing)626Heat exchangers and process pant. Storage and distribution systems. Filtration and treatment plant.